An evening of 11:06, Jiangxia affordable timber mill emergency fire, plant, wood pile was engulfed flames, bamboo furniture threatening to close the timber plant in the other six. Fire department emergency call, after 3 hours to extinguish the fire.
At 0:30 on the 2nd, I heard the news rushed to the scene saw that the fire was put out by the wood burning charcoal pile, was still emitting smoke, fire fighters are fighting over.
bamboo flooring According to the fire scene commander described the incident occurred, the flame Jumping 3 meters tall, brick factory and the open space on both sides of the timber crib piled high all on fire, the fire by another six wind bamboo to the side bamboo kitchen , the spread of wood raw material undertakings. Jiangxia, East Lake High-tech fire two squadrons of seven officers and men of 32 fire engines arrived, determined no one was trapped immediately after the fire fighting pumping from a nearby pond, six gun fire from different directions toward the fire. Until 2:30, the fire was finally extinguished. It is reported that the fire caused direct property losses of 10 million yuan.
The plant owner told the author that the shed piled with 5000 total fir, worth 150,000 yuan. Just on fire, he and his workers tried to save themselves by splashing water buckets. However, the larger the fire can not burn more control, he hastened to call 119 the police. Fire prompts, explosive fire site, to the first alarm, the fire-fighting to win time. At present, the cause of the fire is still under investigation.